Wertachkraftwerk Winter Augsburg
Project: installation of a 500 kW S-turbine with 150 rpm to replace a Francis double turbine.
Hydroelectric power plant Niederbühl
Francis-turbine installed
- Water head: 2.05 m
- Flow rate: 4.8 m3/s
- Power: 84 kW
Willstätt
German utility company SÜWAG has built a completely new power station at the river Kinzig near the city of Willstätt. The new power station replaces the hundred years old power plant at the mill channel in the city.
The order to Wiegert & Bähr concerned manufacturing and delivery of the complete generating equipment as well as the entire hydraulic steel structures and trashrack with trashrack cleaner.