{"id":2322,"date":"2017-04-16T09:17:11","date_gmt":"2017-04-16T07:17:11","guid":{"rendered":"https:\/\/wb-hydro.de\/?p=2322"},"modified":"2017-12-06T09:20:37","modified_gmt":"2017-12-06T08:20:37","slug":"fish-overcome-large-level-difference-with-wb-fish-lift-kraftwerk-eglisau-glattfelden-switzerland","status":"publish","type":"post","link":"https:\/\/wb-hydro.de\/en\/fish-overcome-large-level-difference-with-wb-fish-lift-kraftwerk-eglisau-glattfelden-switzerland\/","title":{"rendered":"Fish overcome large level difference with W&#038;B fish lift, Kraftwerk Eglisau- Glattfelden, Switzerland"},"content":{"rendered":"<p>AXPO Switzerland have successfully completed the installation of two fish-lifts after two years erection time.<a href=\"https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-square wp-image-2198\" src=\"https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2-180x180.jpg\" alt=\"\" width=\"180\" height=\"180\" srcset=\"https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2-180x180.jpg 180w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2-80x80.jpg 80w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2-36x36.jpg 36w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2-120x120.jpg 120w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-2-450x450.jpg 450w\" sizes=\"auto, (max-width: 180px) 100vw, 180px\" \/><\/a><\/p>\n<p>Due to the narrow topography a fish- lift was installed at the German side of the river to let fishes overcome the 12 m level difference of the banked-up water. W&amp;B received the order for design, manufacturing and installation of this challenging fish climbing assistance feature. The new fish- lift is significantly smaller and cheaper compared to the existing fish ladders at the swiss bank of the river.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-2197\" src=\"https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-1030x568.jpg\" alt=\"\" width=\"1030\" height=\"568\" srcset=\"https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-1030x568.jpg 1030w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-300x165.jpg 300w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-768x424.jpg 768w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-1500x827.jpg 1500w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-705x389.jpg 705w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1-450x248.jpg 450w, https:\/\/wb-hydro.de\/wp-content\/uploads\/2017\/04\/Fischlift-Bild-1.jpg 1672w\" sizes=\"auto, (max-width: 1030px) 100vw, 1030px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>AXPO Switzerland have successfully completed the installation of two fish-lifts after two years erection time. Due to the narrow topography a fish- lift was installed at the German side of the river to let fishes overcome the 12 m level difference of the banked-up water. W&amp;B received the order for design, manufacturing and installation of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2195,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-2322","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-common-news"],"_links":{"self":[{"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/posts\/2322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/comments?post=2322"}],"version-history":[{"count":0,"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/posts\/2322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/media\/2195"}],"wp:attachment":[{"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/media?parent=2322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/categories?post=2322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wb-hydro.de\/en\/wp-json\/wp\/v2\/tags?post=2322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}