Entries by WB Hydro

Hydraulic Steel Structures project in Swiss Alps

Wiegert & Bähr was selected supplier for the complete hydraulic steel structures and trashrack with trashrack cleaner for this project at extreme mountainous and weather conditions.

Start of Installation in Willstätt

This new power station is equipped with one Wiegert & Bähr Kaplan turbine. At a head of 5,15 m the turbine produces an output of 1.2 MW. The generator is of the permanent magnetic water-cooled type.